Quote:
Originally Posted by f5fstop
One hour is very reasonable, considering they have to drain the coolant (not all the way, but lower than the coolant bottle and heater hoses), then remove the generator, and the tensioner assembly, they put every thiing back.
|
One hour is reasonable for the whole tensioner assembly. They wanted to charge me one hour just to replace the tensioner pulley.