First off let me start by saying that I am a dreaded blinger/urban warrior who terrorizes the mall parking lots and occasionally goes off-road. You can search my posts to see pics of my ride, but even I have to say that there is just way too much shieze (sh!t) going on in the interior of that ride. I will agree with you that the outside, even though it does not suit everyone?s taste, has been pushed to the limit of being over blinged, but it still looks nice.
As far as 3.5 weeks to do all of the install work, that sounds about right. People often do not realize how long it takes to do even all of the small projects, like swap out the hex bolts

. General rule of thumb, how ever long you think it should take, double it! There is a lot of coordination involved in doing a multiple projects like that and one setback can push everything back for days. If a part comes in a week late, that can really screw up the timing of the install. So ease up guys on the install time.
The price to me seems a little inflated, but then again, they aren?t doing all this work for free, time is money. I think that there was some good money made on this deal. That is not the installer?s fault, that is the owners fault for not negotiating better. Obviously the owner is not worried about cost and just gave these guys a blank check to build what the owner thinks is a baddass ride. Don?t dog the installer for the owner?s bad taste.
I think the install jobs looks good, in pics anyway. Not my personal style, but it looks nice.
You have to realize that the off-road guys on this site are very protective and territorial of this forum. When you come on here, especially as a noob, it is best to be humble, understated and honest. If you follow this advice, they will razz you but they will be respectful, for the most part

. Do not make claims that a ghetto?d H2 is qualified as a rock climber because it ain?t. Them is fightin? words ?round here!
