Hummer Forums by Elcova  
Forums - Home
Source Decals

Source Motors
Custom. Accessories.

H2 Accessories
H3 Accessories
Other Vehicles

H2 Source

H2 Member Photos
H2 Owners Map
H2 Classifieds
H2 Photo Gallery
SUT Photo Gallery
H2 Details

H2 Club

Chapters
Application

H3 Source

H3 Member Photos
H3 Classifieds
H3 Photo Gallery
H3 Owners Map
H3 Details
H3T Concept

H1 Source

H1 Member Photos
H1 Classifieds
H1 Photo Gallery
H1 Details

General Info

Hummer Dealers
Contact
Advertise

Sponsored Ads










 


Source Motors - custom. accessories.


Go Back   Hummer Forums by Elcova > General Hummer Talk > Local Events and Activities

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-12-2007, 09:58 AM
DennisAJC's Avatar
DennisAJC DennisAJC is offline
Hummer Messiah
 
Join Date: Jan 2003
Location: ENRAGEMENT FOR HIRE
Posts: 31,286
DennisAJC is an unknown quantity at this point
Default Re: MOAB RUN 2K7

Just be careful you don't violate the Sand filter regulations if applicable around residential areas..

If so, this is always handy to know. I'm writting off the top of my head so forgive me for the spelling mistakes.

a) General. Buried sand filters may be used, provided the effluent is discharged in accordance with the requirements of Section 905.110.

b) Size. Buried sand filters shall be sized as follows:

1) Residential. The sand filter surface area for residential property shall be 200 square feet per bedroom. Where a sand filter is used in conjunction with an approved aerobic treatment plant, the surface area of the sand filter may be reduced by 50 percent.

2) Non-Residential. All of the following shall be met when a buried sand filter is to be installed on non-residential property.

A) The surface area of the sand filter shall be designed for one square foot per gallon per day for waste with an influent Biochemical Oxygen Demand (BOD) not to exceed 300 parts per million (ppm).

B) A sand filter with flows of 801 gallons or more per day shall have the effluent distributed into the sand filter by a pressure dosing system designed according to subsection (l) of this Section.

C) The sand filter shall be dosed 4 times per day with equal flows not to exceed the design capacity of the filter.

c) A single individual sand filter shall be used to treat flows from a wastewater source. Splitting flows prior to treatment or the use of multiple sand filters shall be prohibited unless subsurface disposal of the effluent is used. Where allowed, splitting of flows shall be done by pumps.

d) Minimum Size. The minimum size buried sand filter shall be designed to treat at least 100 gallons of waste per day.

e) Sand Filter Media. The depth of filter media shall be a minimum of 24 inches. The sand shall have an effective size of 0.5 to 2.0 millimeters, and a uniformity coefficient of less than 3.5. It shall be clean and free of clay and silt.

f) Alternate Media. Other filter media may be used in a subsurface filter provided it meets the criteria of subsection (e) of this Section and complies with the following requirements.

1) Is chemically and biologically inert.

2) Will support biological growth.

3) Has a hardness equivalent to, or greater than, that of sand.

g) Filter Media Cover. The filter media shall be covered with a minimum of 10 inches of clean coarse gravel or clean stone which is free of mud, silt or clay, ranging in size from 3/4 to 2 1/2 inches in diameter. The gravel or stone shall be covered with straw, untreated building paper, or other permeable material prior to backfilling. A minimum of 12 inches earth cover shall be provided. (See Appendix A: Illustration N of this Part.)

h) Distribution and Collection Lines. The distribution and collection lines shall conform to the requirements for distribution lines as given in Section 905.60(b)(2). The distribution lines shall be level, shall be located 18 inches from sidewalls, and shall be spaced on 3 foot centers. There shall be solid pipe to the filter media. The collection lines shall have a slope of 6 inches per 100 feet and one collection line shall be provided for each 10 feet of width or fraction thereof. The upper end of the collection line shall be capped.

i) Bedding Material. The bedding material for the collection lines shall be placed as shown in Appendix A: Illustration N of this Part, shall be clean gravel or clean stone which is free of mud, silt or clay. The coarse gravel shall range in size from 3/4 to 2 1/2 inches in diameter and pea gravel shall range from 1/8 to 3/8 inches in diameter. A minimum of 2 inches of coarse gravel shall be placed on the excavation before placement of the collection lines.

j) Venting. A minimum of one vent shall be placed on the downstream end of the distribution lines as shown in Appendix A: Illustration N of this Part. These vents shall be placed as close as possible to the corners on the downstream distribution lines. The vents shall extend above the ground surface and be screened with 1/4 inch mesh screen or equivalent.
__________________
.
My advice to you is get married: if you find a good wife you'll be happy; if not, you'll become a philosopher.

My Video Collectionez




Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 12:27 AM.


Powered by vBulletin Version 3.0.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.