Quote:
Originally Posted by f5fstop
I'm back at work this morning, maybe, if I have time, I'll call engineering about the marker lamps. Marketing does not make this decision, it is a decision by engineering. (Ever see a marketing person actually work on a car or truck?  ).
Only interior changes in the '07 are the location of the switches will be moved, but H3 Builder stated the start of production on that will be after Christmas shutdown. Shutdown, if vehicles are selling good, which I believe they are, starts on the Friday before Christmas and ends on Jan. 2. Some plants are closing for three weeks, but not sure about Shreveport.
|
Thanks F5..As Stated Last check yesterday by GM Marketing was 4 more weeks. I had assumed they checked with Engineering and or Production.
But your check is the one that counts . Thanks.
I'm going to wait till Jauary now to order or search the world for what I want..so hopefully I'll get the latest Verison of the H3.