Well, here's a teaser.
Gas can carrier is installed. If it wasn't for the fact that I was missing bolts, it would have shaved about 20 minutes off the time.
Install time - 50 minutes, 20 of which was spent finding replacment bolts that were missing from the package. So this is realistically a 30 minute job.
Here's some teaser pics:
http://www.azhog.org/h3_gas_carrier/IMG_3998a.JPG
http://www.azhog.org/h3_gas_carrier/IMG_4000a.JPG

I only had yellow colored Blitz cans, so it's not to spec, but you do get the idea.
As soon as I get back from my kid's Kintergarten orientation, I'll post a review and step by step stuff....
FYI - Steve